Rill
RILL / DEVELOPMENT

The product roadmap.

Follow the delivery stages from the available review tools to a connected, evaluated operational workflow.

  1. 01
    Built

    Product foundation

    Website, review workspace, source citations, report retention, operational register and downloads are implemented.

    Open the working workspace
  2. 02
    Ready to configure

    Azure model connection

    Azure OpenAI connector code and configuration checks are implemented. A deployed model, endpoint and server-side credentials are still required.

    Inspect the Azure connector code
  3. 03
    Planned

    Sector data integration

    Connect sensor readings and weather data; train and evaluate a field-specific demand model.

  4. 04
    Planned

    Reviewed field pilot

    Compare recommended allocations with soil trends and operator-recorded water applications across a growing period.

  5. 05
    Planned

    Production operations

    Implement verified accounts, organization access, audit history, retention controls, monitoring and measured capacity limits before commercial operation.

What the next pilot should establish.

Compare recommended allocations with soil trends and operator-recorded water applications across a growing period.

Discuss the product