Rill
The problem

Irrigation demand changes faster than the schedule.

A new weather forecast, a falling moisture reading or a shared pump limit can change the order of the next watering cycle.

Daily decisions

The same water has to serve multiple zones.

When readings, weather and flow limits live in different places, an operator has to reconcile them before setting the next cycle.

  • An isolated sensor reading can hide a failing probe.
  • Several zones may need the same pump window.
  • The plan and the flow-meter record need to be compared.
An irrigation channel beside cultivated fields
One supply can serve several growing blocks.
The problem

A fixed schedule misses changing conditions.

A shared pump puts each zone in competition for the same supply. Rill compares current conditions and pump capacity so the operator can review the next cycle as one plan.

Same farm. Two watering plans.

Fixed schedule
1,500 m³
Reviewed zone plan
1,240 m³

The sample scenario allocates 260 m³ less across eight zones.

Pilot measures

Measure whether the plan improves.

Applied volume

Compare the meter record with the approved allocation for the same cycle.

Forecast error

Evaluate estimates on later weather and soil readings, including gaps in sensor data.

Review time

Measure from the arrival of the latest inputs to the operator’s decision.

Turn field readings into a watering plan.

Bring your daily review process and see how Rill handles the next cycle.